Sun Microsystems, Inc.   Sun System Handbook - ISO 3.4 June 2011 Internal/Partner Edition
   Home | Current Systems | Former STK Products | EOL Systems | Components | General Info | Search | Feedback

DC Power Distribution Board

Sun ZFS Storage 7120 / Sun Fire X4270 M2 / Oracle Exadata X2-2 Vertical PDB
SPARC T3-1 Vertical PDB
Sun Fire X4270 M2 / Oracle Exadata X2-2 Horizontal PDB
SPARC T3-1 Horizontal PDB

Disk Arrays: ZFS Storage 7120
Servers: Sun Fire X4270 M2
Oracle Exadata X2-2, Oracle Exadata X2-8

341-3166 341-3167 511-1513 541-4223
Blue Gnd Bus Bar
Red +12 Bus Bar
Vertical PDB
PDB Assy/FRU


Sun Fire X4270 M2 Codename: Lynx 2U (Hyde+)
Oracle Exadata X2-2 Codename: EX2-2 (Plus)
Oracle Exadata X2-8 Codename: EX2-8 (Plus-Plus)
ZFS Storage 7120 Codename: Amber Road (Iwashi+)

Notes

  1. The Bus Bar and PDB to Chassis screws include captive washers.
  2. The X4270 M2 System Board does not need to be removed to replace the PDB.

References

  1. Sun Fire X4170 M2 and X4270 M2 Installation Guide, 821-0481.
  2. Sun Fire X4170 M2 and X4270 M2 Product Notes, 821-0482.
  3. Sun Fire X4270 M2 Service Manual , 821-0488.



DC Power Distribution Board

Servers: SPARC T3-1

341-3166 341-3167 511-1513 541-4223
Blue Gnd Bus Bar
Red +12 Bus Bar
Vertical PDB
PDB Assy/FRU


SPARC T3-1 Codename: Serpa

Notes

  1. The Bus Bar screws include captive washers.
  2. The PDB to Chassis screw does not include captive washers.
  3. The PDB to Power Supply Cage screw does not include captive washers.
  4. The SPARC T3-1 System Board does not need to be removed to replace the PDB.

References

  1. SPARC T3-1 Product Notes, 821-2059.
  2. SPARC T3-1 Installation Manual, 821-2062.
  3. SPARC T3-1 Service Manual, 821-2064.



DC Power Distribution Board

Disk Arrays: ZFS Storage 7120
Servers: Sun Fire X4270 M2
Oracle Exadata X2-2, Oracle Exadata X2-8

511-1437


Sun Fire X4270 M2 Codename: Lynx 2U (Hyde+)
Oracle Exadata X2-2 Codename: EX2-2 (Plus)
Oracle Exadata X2-8 Codename: EX2-8 (Plus-Plus)
ZFS Storage 7120 Codename: Amber Road (Iwashi+)

Notes

  1. The Bus Bar and PDB to Chassis screws include captive washers.
  2. The X4270 M2 System Board does not need to be removed to replace the PDB.
  3. Remove the Horizontal PDB before removing the Connector Board.

References

  1. Sun Fire X4170 M2 and X4270 M2 Installation Guide, 821-0481.
  2. Sun Fire X4170 M2 and X4270 M2 Product Notes, 821-0482.
  3. Sun Fire X4270 M2 Service Manual , 821-0488.



DC Power Distribution Board

Servers: SPARC T3-1

341-3166 341-3167 371-1437 541-4223
Blue Gnd Bus Bar
Red +12 Bus Bar
Horizontal PDB
PDB Assy/FRU


SPARC T3-1 Codename: Serpa

Notes

  1. The Bus Bar screws include captive washers.
  2. The PDB to Chassis screw does not include captive washers.
  3. The PDB to Power Supply Cage screw does not include captive washers.
  4. The SPARC T3-1 System Board does not need to be removed to replace the PDB.

References

  1. SPARC T3-1 Product Notes, 821-2059.
  2. SPARC T3-1 Installation Manual, 821-2062.
  3. SPARC T3-1 Service Manual, 821-2064.

  Copyright � 2011 Sun Microsystems, Inc.  All rights reserved.
 Feedback