Sun System Handbook - ISO 3.4 June 2011 Internal/Partner Edition | |||
|
|
Solution Type Technical Instruction Sure Solution 1022230.1 : ATR-0866 280R PCI Card
PreviouslyPublishedAs 277736 Description *DISPATCH INSTRUCTIONS* WHAT SKILLS DOES THE ENGINEER NEED:(IS A SITE ENGINEER AVAILABLE?) Nothing beyond basic partner training to be qualified as a Sun Service Delivery Partner. DELIVERY REQUIREMENT: A data backup is not a pre-requisite but is a wise precaution. The customer should conduct an orderly software system shutdown. TASK COMPLEXITY: 1 - FRU This ATR solution has an attached video. Click here to view the video and associated materials. Steps to Follow *FIELD ENGINEER INSTRUCTIONS* PROBLEM OVERVIEW: WHAT STATE SHOULD THE SYSTEM BE IN TO BE READY TO PERFORM THE RESOLUTION ACTIVITY? : A data backup is not a pre-requisite but is a wise precaution. Then power down the system and disconnect the Power Cord. WHAT ACTION DOES THE ENGINEER NEED TO TAKE: Follow standard ESD procedures to avoid Electrostatic Discharge OBTAIN CUSTOMER ACCEPTANCE WHAT ACTION DOES THE CUSTOMER NEED TO TAKE TO RETURN THE SYSTEM TO AN OPERATIONAL STATE: PARTS NOTE: Slot 1 is to the right when viewing the system from the back, Slot 4 is on the left (in the middle of the Systemboard) REFERENCE INFORMATION: Troubleshoting Guide http://dlc.sun.com/pdf/806-4807-10/806-4807-10.pdf Attachments This solution has no attachment |
||||||||||||
|